Posts by rberkness
Hess Tioga Crude Oil Facility – Rail Loading
Project Scope The Hess Tioga facility was a green field project that required the development of 475 acres adjacent to Tioga, ND. The primary focus of the facility was to load Bakken Crude Oil and NGLs (Propane, Butane, Natural Gasoline) onto unit trains for delivery to southern markets. The facility housed a fully automated 20…
Read MoreHess Blue Buttes Compressor Station
Project Scope Blue Buttes Compressor Station was designed and developed to be an integral part of an extensive gas gathering system across North Dakota which is operated by Hess North Dakota Pipeline, LLC. Developed to increase discharge pressure and volume to the Hess Tioga Gas Plant, this Greenfield eight-compressor site produces 50 MMSCFD at an…
Read MoreCimarex Triple Crown Gathering System
Project Scope Cimarex Energy Co. has been and is continuing to develop its Triple Crown Natural Gas Gathering System after extensive drilling operations in the Wolfcamp Shale and Bone Springs Sands region of the Permian Basin. Multiple natural gas compression stations with dehydration and condensate offloading capabilities have been installed starting in 2017 and continuing…
Read More