NUSTAR/EOG ST. James Rail Offloading
Project Scope NuStar-EOG joint venture to deliver Bakken crude to the St. James, LA complex. Facility included a 20-spot, double sided railcar offloading facility, measurement and connecting piping. The electrical, instrumentation, and automation engineering scope included utility interface to supply power and distribution to the facility, communication interface to TopTech data management system, design of…
Read MoreONEOK NGL Pipeline, L.P. Carney Booster Station Expansion
Project Scope Oneok NGL Pipeline, L.P. expanded the thru capacity of their Carney NGL Booster Station by adding an additional 500HP, 480V, VFD controlled NGL pump and replacing the existing discharge valve. A new 12’ x 26’ electrical building was added to house a new PLC control system, single phase 120VAC UPS, 480V/2000A/3P4W switchboard, 480V/250A/3P4W…
Read MoreJP Energy Partners Unloading Facility & Metering Station
Project Scope JP Energy Partners planned a crude oil gathering, storage and mainline pump facility located south of Cherokee, Oklahoma and a crude oil pipeline metering station at Cushing, Oklahoma to serve the new Great Salt Plains 8” Crude Pipeline originating in Cherokee, Oklahoma and terminating in Cushing, Oklahoma. The Cherokee Crude Oil Unloading Facility…
Read MoreSelas Fluid Processing Corporation GOX3000 Air Separation Facility
Project Scope Selas Fluid Processing Corporation/Linde Gas constructed a 3,000 ton/day air separation facility near Lewisville, Arkansas for the purpose of producing and selling liquefied nitrogen and liquefied oxygen. The main components of the air separation facility are a 12,000HP/13.2kV Recycle air compressor, 2,500HP/13.2kV Main air compressor, cryogenic cold box and storage for liquefied oxygen…
Read MoreUnited States Air Force 27th Special Operations Wing
Project Scope Excellence was contracted to provide Design/Build Services for aircraft hangar electrical upgrades and aircraft battery charger room upgrades at Cannon AFB, New Mexico. The upgraded battery charging room required the design and installation of a non-load bearing wall and door, upgrading the electrical system, lighting, fire protection and notification system, dedicated HVAC and…
Read MoreMagellan Midstream Standard Design – Ratio Blending
Project Scope The standard metering pump skid was requested to be a self-contained unit that would control itself to match pace with a site meter and monitor the output of product off of the skid. The skid was designed to be able to be installed at multiple locations and be flexible to meet onsite piping…
Read MoreWilliams/Laurel Mountain Midstream Herminie Compressor Station
Project Scope Williams/Laurel Mountain Midstream, LLC added a new two bay natural gas compressor building with one 3612 CAT driven Ariel compressor and space for a future 3612 CAT driven Ariel compressor and a new inlet slug catcher, inlet filter separator, dehydration discharge filter separator and discharge oil coalescer filter at the existing Herminie Compressor…
Read MoreVelocity Midstream – SCOOP Engineering Review
Project Scope Excellence Engineering, LLC was contracted to carry out a comprehensive electrical engineering review of documentation and drawings provided by the client for the South Central Oklahoma Oil Pipeline (SCOOP) Project that was under construction in south-central Oklahoma. Excellence was also asked to provide a hydraulic analysis of the existing pipeline system along with…