Project Scope
Selas Fluid Processing Corporation/Linde Gas constructed a 3,000 ton/day air separation facility near Lewisville, Arkansas for the purpose of producing and selling liquefied nitrogen and liquefied oxygen. The main components of the air separation facility are a 12,000HP/13.2kV Recycle air compressor, 2,500HP/13.2kV Main air compressor, cryogenic cold box and storage for liquefied oxygen and liquefied nitrogen.
Excellence Engineering, LLC provided detailed electrical design services for the ISBL portion of the air separation facility. Excellence’s deliverables included area equipment location plans, area grounding plans & details, area lighting plans & details, cable tray details, underground duct bank routings & details, conduit & cable schedules, panelboard schedules, 15kV & 480V electrical one-line diagrams, 480V motor starter schematics & wiring diagrams, 15kV switchgear schematics & wiring diagrams, annunciator wiring and electrical heat trace piping isometrics & installation details.
- E&I Engineering
- Vendor Documentation Review
- Relay Coordination Studies & Relay Settings
- Factory Acceptance Testing
- Construction Support
Notable Accomplishments & Challenges
- Excellence was challenged with coordinating the electrical scope of work with Linde Engineering (Germany – process design) and Selas (Blue Bell, PA – mechanical design) and managing mid-project design changes while providing deliverables in a timely manner to support the construction and commissioning schedule.