Magellan Midstream Partners Allen Blending Expansion

Project Scope

Magellan Midstream initiated the Blending Expansion project in Allen, OK to increase blending capabilities to match new pipelines rates. The project consisted of three new 107,000 gallon horizontal butane storage vessels, two additional offloading spots, and two new VFD controlled vertical can pumps to increase the injection rates for both natural gasoline (w-grade) and butane (h-grade).

  • Project Management
  • Mechanical Engineering
  • E&I Engineering
  • Civil/Structural Engineering
  • Procurement Services
  • Hydraulic Modeling
  • Arc Flash Analysis
  • Construction Support

Notable Accomplishments & Challenges

  • Quick design revisions were executed because of undocumented underground obstructions.