Project Scope
Kinder Morgan’s Wild Basin facility is a high BTU natural gas and NGL delivery point from their Bakken gathering system to an Oasis Midstream gas processing plant. The facility was designed to accept 55 MMSCFD of 2 phase natural gas. The product was stabilized by flashing in a 2 stage process to deliver a high and low pressure gas feed to the 3rd party gas plant while also collecting and trucking out the produced NGLs. Excellence Engineering’s support of Wild Basin lasted from May 2018 to February 2019.
- Project Management
- Process Engineering
- Condensate Stabilization
- Civil Engineering
- E&I Engineering
- Mechanical Engineering
- HAZOP/PHA
- Helical Pile Design
- Electrical Heat Trace Design
Notable Accomplishments & Challenges
- The facility had a late change driven by upper management to make the facility PSM compliant based upon Excellence Engineering’s recommendation.
- Project schedule maintained through construction regardless of regulatory change in scope.