Project Scope
The group of projects were executed to bring compressor station upgrade projects into compliance with NFPA 70E. Excellence provided a field survey to gather site information to analyze the installed electrical system which included circuit breakers, motor starters, panelboards, motor control centers, transformers, feeder and incoming line cables, and other wire and cable types. The data was utilized in the creation of an ETAP model in which an arc flash report and hazard labels were created.
- Arc Flash Study
- Short Circuit Analysis
- Site Reconnaissance
- ETAP
- Facility Upgrade
Notable Accomplishments & Challenges
- Limited drawings and equipment specifications.