Hess Tioga Crude Storage Expansion

Project Scope

Addition of two 70,000 BBL IFR crude oil storage tanks at the Hess Tioga Rail Loading facility.   Civil, mechanical, and electrical engineering design, programming, and commissioning.  Project included piping, electrical, instrumentation, automation, and fire water and foam systems.

  • Project Management
  • HAZOP/PHA
  • Mechanical Engineering
  • Civil/Structural Engineering
  • E&I Engineering
  • Construction Support and Inspection
  • Programming, Startup, and Commissioning

Notable Accomplishments & Challenges

Upgraded existing fire systems and seamlessly integrated  upgraded  automation and control systems into existing panels.